“
[Ferrocement defined:] A thin walled construction, consisting of rich cement mortar with uniformly distributed and closely spaced layers of continuous and relatively small diameter mesh (metallic or other suitable material).
— Ferrocement
[Ferrocement defined:] A thin walled construction, consisting of rich cement mortar with uniformly distributed and closely spaced layers of continuous and relatively small diameter mesh (metallic or other suitable material).
Clear plastic 4-millimeter sheathing was hand-stapled to the mold for two reasons: ...To stop the moist mortar from falling through the joints and gaps between the wooden battens planking the mold. ...To form a barrier between the wooden mold and the fresh mortar.If no barrier were placed the wood would draw moisture from the new mortar and reduce its final strength.
The first four layers of mesh were stapled to the mold over the plastic sheeting. Each length of mesh, already folded double, formed two layers. This first layer of mesh strips, 1-1/2 feet (457 mm) wide, was butted together. The second layer of mesh strips was laid out so as to cover the joints where the first layer was butted together, making a total of four layers of mesh.
The vertical rods were stapled firmly to the hull. An air-powered staple gun was used...
Two more layers of mesh were stapled over the mold. Again 1" x 2" (25.4 mm x 51 mm) wide staples were used. The folded mesh was not lapped but just butted.
Starter rods for the stem, webs, bulkheads, bilge stringers, and engine beds were welded in place. These starter rods were placed at approximately six-inch (152 mm) centers. They were six inches (152 mm) long where they extended through the hull. Quarter-inch (6.4 mm) holes were drilled for these... The starter rods were lap-welded to either the vertical rods or the horizontals, depending on their position.
One-inch (25.4 mm) chain links were welded to the hull reinforcing cage where scuppers were to be placed. These links were aligned and welded in at deck level. ...[E]xposed steel pieces such as scuppers or screeds which require welding... should always be cleaned and protectively coated.
The hulls were steam cured for 24 hours at a temperature of 150°F (66° C). A steam pipe, perforated for its entire length, was placed under the inverted hull and a rubberized canvas steam tent drawn completely over. The temperature was carefully brought up to 150°F (66°C) in a period of four hours. Twenty-four hours were then maintained at this prescribed temperature until, finally, it was allowed to drop slowly to ambient temperature of 85° F (30°C).
The hull was left untouched for 18 hours after the plaster finishing work had ceased. This allowed the hull to set-up hard enough for the men to drag the steam tent over it. It is not advisable to start steam curing too soon, as the jets of hot water from the steam pipe may wash some of the mortar off the hull while it is still green. Before steam curing began the wooden screeds were removed from around the hull sheer.
Ferrocement is a form of reinforced concrete... [utilizing] closely spaced multiple layers of mesh or fine rods completely embedded in cement mortar. It can be formed into thin panels or sections, mostly less than 1 in. (25 mm) thick... Unlike conventional concrete, ferrocement reinforcement can be assembled into its final desired shape and the mortar... plastered directly in place without the use of a form.
